Be ready for the Megawatt Charging System before the first truck arrives — the MCS connector in your data model, sessions up to 4.5 MW, per-MWh tariffs, and chargers that speak MCS and CCS2 at once.
Heavy-duty electric transport is arriving on a schedule set by regulation, not by choice, and it charges at powers a car platform was never built for. A management system that only knows CCS2 and Type 2 cannot record an MCS connector, cannot price a session in megawatt-hours, and cannot share power between a truck bay and a car bay. By the time the first tractor unit pulls in, that is not a configuration change.
Depot and corridor operators preparing for electric trucks and buses, fleet operators with heavy vehicles on order, and any CPO whose next site has to serve both cars and heavy-duty transport.
Enable This ExtensionBrowse All AddonsEnable or disable per tenant. Pay only for what you use. All addons integrate seamlessly.
The MCS connector sits alongside CCS2, CHAdeMO, Type 2 and NACS everywhere a connector type appears — locations, EVSEs, tariffs, sessions and roaming.
Very high power sessions are handled as they are, not squeezed into a car-sized model. Power, energy and duration stay accurate at megawatt scale.
Plan which vehicle charges when, in a depot where the connections cost more than the trucks are willing to wait. Route-based planning and cargo-aware range estimation included.
One unit serving MCS and CCS2, with power shared dynamically between them — so a bay is never idle because the wrong vehicle arrived.
Price in megawatt-hours, with the tariff structures heavy-duty charging actually uses, instead of stretching a per-kWh tariff past the point where it reads sensibly.
See how a megawatt bay is being used — sessions, energy, occupancy and the hours that matter — and decide the second one on evidence rather than optimism.
How operators around the world can use this extension to solve real problems and grow their business.
An operator preparing a truck corridor expected to run heavy-duty charging on a separate platform, because its existing system had no concept of an MCS connector or a per-MWh tariff. Enabling MCS readiness put the connector, the session handling and the tariff structures in the platform it already ran. The first megawatt bay opened alongside the existing car bays, on one system, one set of tariffs and one settlement run.
Talk to our team and see this extension in action with a personalised demo.